A complete sewage treatment plant built in our own works as a factory-finished, skid-mounted unit in MS Epoxy-Painted (MSEP) construction. It arrives on site as one piece, needs only a foundation and services, and can be commissioned in days rather than months.

Available from 10 KLD to 200 KLD.

Process Flow

Fabricated MSEP packaged STP diagram — single skid with screen, equalization, anoxic, MBBR aeration and tube settler compartments, plus tertiary PSF, ACF, UF

Where It Fits

CapacityTypical ApplicationConfiguration
10 – 25 KLDSmall commercial premises, villas, site officesSingle compact skid
30 – 60 KLDSmall apartment buildings, clinics, schoolsSingle skid with tertiary
75 – 125 KLDMid-size commercial, hotels, hostelsSkid plus separate filter bank
150 – 200 KLDLarger commercial, industrial coloniesMultiple modules in parallel

Why Fabricated

Speed

Built and tested in the works while civil work proceeds on site. Installation and commissioning measured in days. No wet civil trades on the critical path.

Quality Control

Fabrication, epoxy painting, piping and wiring carried out under factory conditions and inspected before dispatch, rather than assembled in a trench.

Relocatable

The unit can be lifted and moved if the site use changes — valuable for construction-phase plants, leased premises and temporary facilities.

MSEP construction is supplied with internal and external epoxy coating over blast-cleaned surface. FRP and RCC construction are also offered where the application or site conditions favour them.

Need a plant commissioned fast?

Fabricated MSEP is our fastest route from order to a running plant — ask us about lead times for your capacity.