Fabricated MSEP Packaged STP
A complete sewage treatment plant, factory-built and delivered in one piece
A complete sewage treatment plant built in our own works as a factory-finished, skid-mounted unit in MS Epoxy-Painted (MSEP) construction. It arrives on site as one piece, needs only a foundation and services, and can be commissioned in days rather than months.
Available from 10 KLD to 200 KLD.
Process Flow
Where It Fits
| Capacity | Typical Application | Configuration |
|---|---|---|
| 10 – 25 KLD | Small commercial premises, villas, site offices | Single compact skid |
| 30 – 60 KLD | Small apartment buildings, clinics, schools | Single skid with tertiary |
| 75 – 125 KLD | Mid-size commercial, hotels, hostels | Skid plus separate filter bank |
| 150 – 200 KLD | Larger commercial, industrial colonies | Multiple modules in parallel |
Why Fabricated
Speed
Built and tested in the works while civil work proceeds on site. Installation and commissioning measured in days. No wet civil trades on the critical path.
Quality Control
Fabrication, epoxy painting, piping and wiring carried out under factory conditions and inspected before dispatch, rather than assembled in a trench.
Relocatable
The unit can be lifted and moved if the site use changes — valuable for construction-phase plants, leased premises and temporary facilities.
MSEP construction is supplied with internal and external epoxy coating over blast-cleaned surface. FRP and RCC construction are also offered where the application or site conditions favour them.